Some of the sockets and light switches have been installed in the house. I picked out the color for the back decks. The gazebo in the side yard to go over the hot tub was rebuilt. They caulked the siding on the house, although the front of the house still lacks some siding and needs the front door installed. I’m still waiting for floors, kitchen build, and bathroom builds. Whether the back decks are built before I move in is not critical.

I also manually pruned the tree/bush that keeps growing into the windmill.